DURING DAYTIME HOURS SATURDAY AND SUNDAY ONLY:
*DUE TO MORE SLIDE MATERIAL AT PAUL’S SLIDE (PM 21.6), All Motorists may travel north on Hwy. 1 from Cambria to Limekiln Creek Bridge (PM 21.3) or south on Hwy. 1 from Carmel to Dolan Pt. (PM 29.70).
*We have multiple areas with challenges, the biggest being at:
1) Mud Creek (PM 8.8)—drilling taking place with daytime one-way traffic control (flagging).
2) We have a failed culvert at PM 14.4 but it is now temporarily passable, covered with steel plates, just north of Sand Dollar Beach (PM 13.85).
3) At Paul’s Slide (PM 21.6), although we have a temporary stop sign—MORE MATERIAL IS COMING DOWN AND THERE IS A FULL CLOSURE AT PAUL’S.
4) At Big Creek/Cow Cliffs (28.09/28.35) we have a hard closure due to damaged rock netting and exposed rock fall.
*Locals may travel north today on Hwy. 1 from Cambria to just south of PAUL’S SLIDE (PM 21.6)*
The roadway is not passable between PAUL’S SLIDE (PM 21.6) and Dolan Pt. (PM 29.70).
OVERNIGHT CLOSURES: Hwy. 1 will remain closed overnight from Ragged Point (SLO 72.87) to Dolan Pt. (MON. 29.
Note: the current expectation is that this light will be active thru the 2028 Big…
To all those who made the ultimate sacrifice for our county, and an apology for…
Not really a photo, but I like this. Created by See Monterey. Slogan by Kate…
Monterey County Board of Supervisors Fact Sheet: Bixby Bridge Parking Moratorium Meeting Date: Tuesday, May…
Memorial Day, the unofficial beginning of the summer tourist season is almost upon us. Tuesday…
This website uses cookies.
View Comments
Today, Sunday, we were just down at north side of Paul's Slide before 7am and it was CLOSED!! There was a woman there reading a bible that said you had to be there before 6am! Well, it ruined our plans but I hope it doesn't ruin anyone else's. I didn't see anywhere on this website that they changed the hours. Please update!! This is so frustrating! My internet is spotty so I'm only on email once or twice a week. I am a real person here in Big Sur
If you didn't see it, you didn't look. I've been publishing the new hours for WEEKS. Look at the date of the post. This post is a very old one, in changing-highway-condition-terms.
On April 3rd I posted: "Paul’s Slide (PM 21.6):
· As of March 22nd , there is limited access due to major excavation above the roadway; access is limited to 5:30am – 6:00am and 7:00pm – 7:30pm. This will be for a minimum of four to six weeks and we will continually evaluate for opportunities to improve local resident access.
· For the Friday opportunities to resupply, access is limited to vehicles weighing 50,000 lbs., with a maximum vehicle length of 30 feet.
· Work will performed 24/7 as conditions allow, and updates will continue to be provided."