**NEW IMPORTANT INFORMATION FOR TOMORROW, PENDING BRIDGE SURVEY RESULTS AT 9 AM ***

VEHICLES WILL BE ALLOWED TO CROSS PFEIFFER CYN BRIDGE, ONE VEHICLE AT A TIME, ESCORTED BY CHP, FROM EITHER DIRECTION FOR TWO SESSIONS: 1) 10 AM TO 1 PM AND 2) 2 PM TO 5 PM. THERE IS A 20 TON LIMIT. THIS IS SOLELY DEPENDANT UPON THE RESULTS OF THE BRIDGE SURVEY/ASSESSMENT TO TAKE PLACE AT 9 AM ON WEDNESDAY, FEB. 15…EXPECT THE ‘GO AHEAD’ OR ‘CEASE OPERATIONS’ UPDATE AT 9:30 AM TOMORROW.* NOTE: THESE PROVISIONS ARE ONLY FOR CRITICAL AND NECESSARY TRIPS.

State Route 1 continues to be closed between Ragged Pt. (SLO 72.87)
and Pfeiffer Cyn Bridge(PM 45.5).

Motorists may travel north on State Route 1 from Cambria to Ragged
Point (SLO PM 72.87) or south from Carmel to Pfeiffer Cyn. Bridge (PM
45.5)

The roadway is not passable between Ragged Pt (SLO 72.87) and Dolan
Pt (PM 29.70) or to vehicles at Pfeiffer Cyn. Bridge (PM 45.5)

*LOCALS MAY TRAVEL BETWEEN RAGGED PT AND LIMEKILN (PM 21.3) OR TRAVEL BETWEEN DOLAN and SOUTH of PFEIFFER CYN BRIDGE (PM 45.5).

*IMPORTANT NOTE TO LOCALS: ANOTHER STORM IS ANTICIPATED THIS THURSDAY, FEB. 16. IT IS UNKNOWN HOW THE BRIDGE WILL SUSTAIN ITSELF. PFEIFFER CANYON BRIDGE WILL FULLY CLOSE – INCLUDING TO PEDESTRIANS – FOR THE DURATION OF THE RAIN DUE TO SAFETY PRECAUTIONS.

*BUSINESSES REMAIN OPEN*

bigsurkate

Appointed appellate counsel for indigent defendants (retired.) I have lived in Big Sur since 1984, first on the north coast, and on the South Coast since 1989.

View Comments

  • Those pillar fractures look like they have gotten worse, I wouldn't want to chance it . What surveillance equipment will bridge survey team be using?

  • figure that the column is presently of zero significance in supporting the bridge deck, and it is designed to separate and fall away without compromising the structural integrity of the deck it is performing exactly as designed.

    the loss of the column diminishes the weight capacity of the deck, otherwise not critical

    larger issue is whether the land and soils movement will compromise the bridge abutment, the anchor where the bridge deck meets the ground. those big cracks, eh, not so good...

    surveillance equipment? how about eyeballs in competent, experienced heads. that's what they're using. the most practical and successful tool in their tool-box.

Share
Published by
bigsurkate

Recent Posts

Highway One Closure Update from CalTrans

Plaskett Fire: To support Plaskett Fire emergency response efforts, Highway 1 remains closed to through traffic between…

8 hours ago

Plaskett Fire, Day 10, 9/4, Morning Update

2026 Plaskett Fire Incident Update Los Padres National Forest Friday, September 4, 2026 Fire Information:805-257-9891…

10 hours ago

Plaskett Fire, Day 9, 9/3 Morning Update

29,120 acres and 1% contained The Plaskett Fire remains far more volatile than the Timber…

1 day ago

From Andrew our amazing Post Master:

Good evening :) With the good news of the road opening tomorrow - most of…

2 days ago

Plaskett Fire, Day 8, 9/2, Afternoon Update

2026 Plaskett Fire Incident Update Los Padres National Forest Wednesday, September 2, 2026 Fire Information:805-257-9891…

2 days ago

Evacuation Orders/Warning downgrades for Timber Fire, 9/2

Effective Wednesday, September 2, at 7:00 PM, the Monterey County Sheriff's Office plans to downgrade several…

2 days ago

This website uses cookies.