Aerial Photos of Pfeiffer Canyon Bridge Cracking in Half 2/23/17, by Stan Russell

Original post can be found here: www.thebigsurblog.com

Photos of Pfeiffer Canyon Bridge from a helicopter today.
Flight by Specialized Helicopters, Watsonville
Photography by Stan Russell

Pfeiffer Canyon Bridge

Pfeiffer Canyon Bridge is cracking in half. The drilling rig on the right will be drilling for two weeks to determine the geology of the area to determine how to anchor the foundation of the new bridge. Their report is due March 16, 2017

The crack is now all the way through the bridge. The rebar is holding this bridge up while the support

From the surface of the roadway


The surface of Pfeiffer Canyon Bridge is cracking in half and collapsing as shown in this image. Photo by Stan Russell

Another angle to show how much the bridge has sagged while we can do nothing but wait for it to break. Photo by Stan Russell

LucasRyanCV

View Comments

Share
Published by
LucasRyanCV

Recent Posts

One Way Traffic Control on Highway One Near Torre Canyon for the next 5 weeks.

Date:        Tuesday, October 13, 2026 District:   05 – Santa Barbara, San Luis Obispo, Monterey, San Benito, and…

1 day ago

Sunday Photos – a surprise find: 50 year old Life Magazine

I think my mother, god bless her, saved this for my daughter who was born…

3 days ago

No Kings Day, 10/17

SAT, OCTOBER 17th NO KINGS RALLY in Monterey at Window on the Bay, 2 pm…

2 weeks ago

This website uses cookies.