All previously provided information remains the same, so only including the photos:
Photos of: 1-2) Mud Creek—with new equipment on mid-slope on Tuesday, June 27 3-5) Paul’s Slide (PM 21.6)—Panoramic, busy workday pic and huge boulder yesterday, June 29; 6-7) Pfeiffer Bridge Construction (PM 45.52) temporary tower and welding of temporary tower grillage to aid in the future launching of the new bridge over the canyon—photo from yesterday, June 29.
*NO CONVOY SCHEDULED FOR PFEIFFER CANYON BRIDGE NEXT WEEK (JULY 3-7)*
There are several places where one can barely drive through. (See collage of photos below.)…
Big Sur Bakery fire leaves a grieving community. Photo by Ivy Jayne LaVelle “It was…
The links in the screen shot are not active. Zoom Option: https://montereycty.zoom.us/j/96244171607
Here are some stills from a video that Ivy took about 1/2 hour ago or…
This update contains no new information, but a nice photo. Here it is in any…
View Comments
Each picture tells a story.
There's some heavy duty work going on towards restoring Hwy 1 in Big Sur.
Kate,
How many days left for the NF "little" bridge examination status report to arrive?
Looks like that one Caltrans worker could pull off a double back flip off that Giant boulder on his descent.
How do they deal with those massive boulders? Really curious.
They blast them with dynamite.
https://bigsurkate.blog
I want to thank you for all of your hard work keeping us updated. You are doing a terrific job!!!! I love Big Sur & know that everyone who is suffering thru this tough time will once again enjoy Highway 1 being open when it is time. Andrea RuleKetchum, Idaho
great update job! keep them coming!:))