I bean delivery, photo by Steve Harper:
That guy in the back end is steering it, sort of like a long fire engine.
There are 15 girders, each 62 feet long and 62 tons.
Below photos by Cal Trans
Girders arrived at the bridge site this morning.
From Heather Cox Richardson today: “If you google the history of Mother’s Day, the internet…
I find the MoCo website a nightmare to navigate or I would post links to…
Notice of Meeting County of Monterey Big Sur Multi-Agency Advisory Council IS HEREBY GIVEN that the Big…
HIGHWAY 68 CORRIDOR TO MOVE TO ADAPTIVE TRAFFIC SIGNAL CONTROL BEGINNING MONDAY, MAY 4 MONTEREY…
All photos taken at River Inn on Friday, May Day. I would rather give my…
Date:Thursday, April 30, 2026District:05 – Santa Barbara, San Luis Obispo, Monterey, San Benito, and Santa…
This website uses cookies.
View Comments
There's a happy sight!
Awesome!
Is 8 weeks the proper chill time for champagne?
Sounds about right, Tim...
https://bigsurkate.blog
Good news, indeed.
Now we no longer have to jump the gap in our car like "Smokey and the Bandit" or the Duke boys. :-)
That bridge failure has made my life very difficult. I am eager to see it finished as soon as possible.
Great post.
Thanks.
Those are some very large girders. Hoping everyone stays safe.
Rebuilding the bridge is an environmentally unsound idea considering it will reinstate the traffic flow that has precipitated the degradation of Big Sur. The community needs to rethink their plan of action in relation to preserving Big Sur vs opening it up for exploitation.
I hope in some way they also make the architectural style of this bridge have a little bit of character to fit in with traditional Hwy 1. I had an idea for the slide area, but doubt they's ever take it seriously.
http://timeless-environments.blogspot.se/2017/07/highways-tunnels-bridges-oh-my.html