Today’s Date: Monday, July 30, 2018
District: 05 – Santa Barbara, San Luis Obispo, Monterey, San Benito and Santa Cruz Counties
Contact: Susana Z Cruz (bilingual) or Colin Jones
Phone: (805) 549-3138 or 549-3189
FOR IMMEDIATE RELEASE
EMERGENCY RETAINING WALL WORK AT PAUL’S SLIDE REQUIRES THREE FULL OVERNIGHT CLOSURES IN BIG SUR STARTING SUNDAY NIGHT, AUG. 5
MONTEREY COUNTY – Augmenting the existing retaining wall will require both directions of State Route 1 at Paul’s Slide (PM 21.6) to fully close overnight for three nights, starting on Sunday, August 5th.
The highway will be closed from 10 pm to 6 am the next morning. Motorists/cyclists are advised to plan around these three emergency overnight hard closures. This roadwork should be completed by Wednesday morning, Aug. 8th at 6 am.
Paul’s Slide suffered major storm damage last January, 2017, losing part of its embankment including the southbound lane and closing for several months. Paul’s Slide remains active and continues to be monitored; it has currently been operating under a temporary traffic signal for the last 12 months and the signal will remain in place.
John Madonna Construction is the contractor for this project. Augmenting the existing retaining wall at Paul’s Slide will ensure a safer environment for all travelers.
Caltrans reminds motorists to move over and slow down when driving through Highway work zones.
For more information on this project and for traffic updates on other Caltrans projects in
Monterey County, residents can call the District 5 toll free number at 1-831-372-0862 or
can visit our website at: http://www.dot.ca.gov/dist05/paffairs/release.htm#mon
# # #
–PHOTOS ATTACHED AND BELOW—
Paul’s Slide Photo #1 from today showing Retaining Wall needing Repairs
Paul’s Slide Photo #2 from today showing Retaining Wall needing Repairs
Susana Z. Cruz
Caltrans District 5
Public Information Officer
Portavoz de Relaciones Públicas
para Caltrans en el Distrito 5
805.549.3326–fax
We welcome your feedback: https://www.surveymonkey.com/r/RNBZG55
