Additional Road Work next week

Highway 1 Big Sur: October 8 – October 12
Daytime work along Highway 1 will result in traffic control and flagging at multiple locations between 8:30 a.m. and 4 p.m.

The locations are:

  • Big Creek Bridge – striping
  • Bixby Creek Bridge -striping and bridge work
  • Willow Creek Bridge – striping
  • Garrapata Creek Bridge – striping
  • Garrapata Creek Bridge to Granite Canyon Bridge – drainage work

 

Drainage work on Highway One next week

CALTRANS TO PERFORM DRAINAGE WORK ON STATE ROUTE 1 BETWEEN GARRAPATA CREEK BRIDGE AND GRANITE CREEK BRIDGE SOUTH OF CARMEL HIGHLANDS STARTING MONDAY, OCTOBER 8

MONTEREY COUNTY –Caltrans Monterey Maintenance crew will be doing one-way reversing traffic control to remove debris from drainage/flow lines on both directions of State Route 1 between Garrapata Creek Bridge and Granite Creek Bridge south of Carmel Highlands starting Monday, Oct. 8 through Friday, Oct. 12, from 8 am to 2 pm each day, Caltrans officials announced today.

There will be electronic message boards alerting the public of this lane closure.  Motorists should not encounter delays exceeding five minutes. This roadwork will be performed by the Caltrans Monterey Maintenance crew and the purpose of the drainage work is to remove debris from the flow lines as part of winter preparation and to ensure a safe environment for all travelers.

 Caltrans reminds motorists to move over and slow down when driving through highway work zones.

For more information on this project and for traffic updates on other Caltrans projects in   Monterey County, residents can call the District 5 toll free number at 1-831-372-0862 or can visit our website at: http://www.dot.ca.gov/dist05/paffairs/release.htm#mon