Mud Creek to open by 3:30 today

Photos 1 and 2 of Mud Creek show grouting the cracks to minimize water intrusion and slide displacement above the roadway looking north. Photo 3: shows Paul’s Slide huge boulder before it’s blasted and 4) Video of boulder blasting at Paul’s Slide.

0B21D27A-F4B0-40E7-B829-4E78DB6ECF8B1937529D-3553-449D-8723-EAE10ADB5CFAB9CB30BE-528F-4439-BE5B-A7147781D5DE

Today’s Date: March 8, 2019 at 11:30 am

District:           05 – Santa Barbara, San Luis Obispo, Monterey, San Benito and Santa

Cruz Counties

Contact:          Susana Z Cruz (bilingual) or Colin Jones

Phone:            (805) 549-3138 or 549-3189

FOR IMMEDIATE RELEASE

**UPDATE #3–TRAFFIC ADVISORY**

HWY. 1 AT MUD CREEK TO RE-OPEN BY 3:30 PM TODAY AND PAUL’S SLIDE RE-OPENED YESTERDAY; MUD CREEK MAY INCLUDE TRAFFIC CONTROL

MONTEREY COUNTY — Caltrans has received confirmation from National Weather Service (NOAA) data that the significant storms have passed in the areas of Mud Creek (PM 8.9) and Paul’s Slide (PM 21.6) on State Route 1 in the Big Sur area. Caltrans Geotech, Maintenance Design and Maintenance crews assessed all road areas within the closure limits again earlier today. Contractor and Caltrans crews have been busy clearing slide material, repairing and paving the roadway to make it traversable for public traffic. As a result, Highway 1 at Mud Creek will re-open today, Friday, March 8 by 3:30 pm; Hwy. 1 at Paul’s Slide re-opened yesterday. (See photos attached). Motorists may encounter traffic control at Mud Creek over the weekend.

NOTE: Our maintenance crews will monitor this location over the weekend and notify us if the movement accelerates or site conditions change. In which case, an update will be provided.

Thanks to the Big Sur community and coastal travelers for their cooperation and patience.

Susana Z. Cruz, Caltrans District 5, Public Information Officer

One thought on “Mud Creek to open by 3:30 today

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.