I wrote to Jim Shivers, as the two different times did not make sense to me. He clarified with Kevin, and this is what he sent me:
“It would be a good rule of thumb to not post any Palo Colorado work.
I have asked our construction team to straighten this out.
It causes unnecessary confusion.
There are no closures at all associated with the entry for Bixby Bridge / Palo Colorado.
Please eliminate any reference to these in future reports.
This is an error in the lane closure report.
I hope to have this remedied going forward.
The Rocky Creek overnight closure times are almost always 10 pm to 6 am.
I hope we do not cause trouble for anyone by the posting of a 5 am reopening.
I will bring this up with the construction team as well.
Appreciative of your patience.:
