Tourist Tuesdays, 4/10/18

Noon, from a Highlands Neighbor:

”I called Christine Poe around 9:30 and was transferred to her after a short wait. She was very understanding of the frustration we are all experiencing in getting through the Rio Road/Hwy. 1 intersection. I mainly spoke with her regarding the safety issues of having that intersection blocked if there an emergency, the possible impatience of a driver deciding to pass other vehicles, and the lack of well timed traffic lights. She did tell me that engineers were scheduled to be at the site today to discuss the traffic situation and she would add my safety concerns to their discussion. She also suggested having Highway Patrol there to control traffic in person might alleviate the problem. Unfortunately, the CHP site notes that they do not have the man power to do so.”

6:30 am – With the road work at Rio Rd. to last through the summer, this will be the 3d summer in a row where local Big Sur businesses face challenges. Patience will be required, and weekend trips to town will be curtailed. Three big events are scheduled during this construction project: Big Sur Marathon, Sea Otter Classic, and Amgen. The Concours is scheduled for the end of August. Any bets on whether the construction will be finished in time?

I am taking this day off from Tourists and Tourism and enjoying the spring weather and planning for gardening projects. I need grounding and balance.