Highway 1: Road Conditions 6/17-23

                               ROAD AND LANE CLOSURES SCHEDULED FOR JUNE 17 – JUNE 23

 

MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County fromSunday, June 17 through Saturday, June 23newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 Storm Repair Along the Big Sur Coast
Due to past slides, State Route 1 is now closed at the Ranger Station North Ragged Point Inn and at Mud Creek.

Highway 1 – Carmel: June 18 – June 21 
Caltrans will perform highway pavement maintenance on State Route 1 south of Carmel Highlands for four days beginning Monday, June 18. Motorists can expect one-way reversing traffic control from8 am until 2 pm in the following locations:

There will be electronic message boards alerting the public of these lane closures and traffic control.  The California Highway Patrol (CHP) will be present to ensure a safe environment for everyone.  Motorists can expect delays not to exceed 10 minutes.

Highway 1 Climbing Lane Project: June 18 – June 22
The Climbing Lane project will move into Phase 1B this week with both day and overnight work.

Here is what is happening this week:

Work will include paving Highway 1 between Carmel River Bridge and Carmel Valley Road and the south east corner of Rio Road as well as moving cement barriers to change the traffic flow on Rio Road from the north to south side by Thursday morning

Drivers wishing to avoid the intersection may detour to Carmel Valley Road and Carmel Rancho Boulevard. All business and shopping centers remain open during construction.

Sign up to receive text message alerts by texting Climbinglane to 888777.

Highway 68 – Monterey to Laguna Seca: June 18– June 22
Night time road work along Highway 68 between highway 1 and Laguna Seca from will result in lane closures and delays 7:30 p.m. to 6 a.m.

Highway 68 – Salinas River: June 18 – June 22
There will be alternating lane closures on eastbound and westbound Highway 68 between Spreckles Blvd and Reservation Road for bridge work. The work will occur from 9 a.m. to 3 p.m., Mondaythrough Friday.

Highway 101 – Greenfield to Salinas: June 18 – June 22
Daytime vegetation spraying Highway 101 between Espinosa Road in Greenfield and Boronda Road in Salinas from 8 a.m. to 2 p.m.

FOR ALL UPDATES AS THEY ARE RELEASED, GO TO THE TAMC WEBSITE, HERE:

http://www.tamcmonterey.org/cone-zone-report-12/

Mud Creek to open end of July

Much anticipated announcement, and good news, for a change.

*UPDATE*

Caltrans Continues Efforts to Rebuild and Reopen Highway 1

at Mud Creek

New Estimated Opening Slated for end of July

BIG SUR, MONTEREY COUNTY – As Caltrans continues efforts to rebuild and re-open Highway 1 at Mud Creek, the department has announced a new target date of the end of July for opening the route to all travelers.

Department officials announced last August that a new ¼-mile roadway will traverse the site of the massive Mud Creek landslide.

The new roadway will be realigned across the landslide and will be buttressed with a series of embankments, berms, rocks, netting, culverts and other stabilizing material according to department engineers and geologists. This strategy is allowing Caltrans to rebuild the roadway more quickly and at a lower cost than other alternatives such as structures, a tunnel or major earthwork that puts additional fill into the ocean.

“Rebuilding Highway 1 and restoring traffic along the Big Sur coast has been our priority and by opening the highway sooner than expected, it will boost the many central coast communities affected by this major landslide,” said Caltrans Acting District 5 Director Richard Rosales.

The massive slide occurred on May 20, 2017, dumping more than 6 million cubic yards of material onto the roadway and into the ocean, creating 15 additional acres of coastline, making it the largest one ever along the Big Sur coast.

Caltrans engineers have been working closely with contractor John Madonna to increase rebuild productivity, so this combined with favorable weather and longer days will allow us to open the road sooner than our previous mid-September estimate.

Caltrans is continuously evaluating the opening date as roadwork progresses so we anticipate providing a final update by early July. It’s expected that after the highway opens, intermittent weekday lane closures and roadwork will continue for several months to finalize repairs.

–Photos below—

AF286E52-ADED-4517-8C49-4563347B28A0

June 1, 2017

F955DB2B-42EB-42D1-8CAA-F9B5E77655F3

June 3, 2018

Mary Adams’s response to today’s traffic SNAFU

Thank you, Mary, for listening to your constituents.

”We are trying to get to the bottom of today’s horrendous traffic situation on State Route 1 south of Carmel. A car accident, shoulder clean up work at the Carmel River Bridge causing drivers to slow and look, increased summer southbound traffic, the Big Little Lies movie trailers at Marathon Flats, and the additional Caltrans work and lane closure at Monastery Beach all contributed to the already impacted construction zone.

In response to today, CalTrans will not be doing any additional work at Monastery this week as had been originally scheduled. They will continue to perform highway pavement maintenance at Otter Cove tomorrow and at Soberanes on Thursday. If you are south of either of these two locations, we recommend getting through these areas before 8 am.

Additionally, there will be filming at Monastery Beach this Thursday, June 14. Caltrans, the permitting agency, has told us the project is not expected to impact traffic flow and will take place on the beach. Parking will be at the meadow adjacent to the Bay School and seven spaces to the north end of the beach.

Our office is continuing to seek ways to expedite the Climbing Lane Construction project. We are urging the county to invest in night work and extended shifts. Please continue to reach out to us with questions. We share your concerns and are working diligently to reduce the impacts of this work. Our office can be reached at 831-647-7755 or by email at district5@co.monterey.ca.us.

Together, we will get through this!”

Highway One Traffic Backup, 6/11/18

Between the Rio Rd. Climbing lane construction, and the noticed work at Monastery Beach, traffic NB – going in to Carmel – is backed up to Yankee Point this morning, and it is taking 20 minutes to travel 1 mile, per Rob Wilks who sent this photo just now (11:15 am)

EDF73DA7-B75D-4DD7-9D0E-4AC3ECF30F93

Just a reminder of what I posted two days ago:

Highway 1 – Carmel: June 11 – June 14 
Caltrans will perform highway pavement maintenance on State Route 1 beginning Monday, June 11 – Thursday, June 14. Motorists can expect one-way reversing traffic control from 8 am until 4 pm in the following locations:

 

Highway Closure Update, 6/11/18

8FF2AFC6-DE08-40CE-94D7-42659FDEC1D7

BC5FF46F-E8EB-42F3-9DE1-F43E7740E260

65500094-2AF3-4B1E-AC82-2D2BED674CA2

B5FF6F09-F4FF-45D1-AC57-4D0B1ECED5C1

Aerial photo of Mud Creek (PM 8.9) from Sunday, June 3, courtesy of John Madonna. Three pictures of Post Ranch Rockery Repair (PM 44.9) from Friday, June 8.

 HIGHWAY 1 UPDATE – Monday, June 11

State Route 1 in Monterey County remains closed from north of Salmon Creek, just south of the Ranger Station (PM 3) to just south of Gorda (PM 10) due to the Mud Creek slide. State Route 1 south of Salmon Creek is accessible via State Route 1 in San Luis Obispo County near Ragged Point.

REMINDER: Travelers still CANNOT access the entire length of Highway 1 from Carmel to Cambria but local businesses are open on both sides of Mud Creek.

Mud Creek (PM 8.9)

Mud Creek had a major slide on Saturday, May 20, 2017, losing over 5 million cubic yards of material. Caltrans continues with its plan to realign the existing terrain. Caltrans will continuously evaluate the opening date as work progresses so we anticipate providing an update in July. It’s expected that even after the highway is re-open, intermittent lane closures and roadwork may continue. The updated current cost is at $54 million.

There is currently no public/local access through the Mud Creek area since this remains an active, emergency construction zone.

This week: No change from last week; work continues with the north fill, north cut and north berm with hilfiker retaining wall.

Paul’s Slide (PM 21.6)

Paul’s Slide is still active but the 24/7 traffic signal remains in place and temporary guardrail (k-rail) in the centerline.

ADDITIONAL WORK—CALPORTLAND PAVING BETWEEN LUCIA (PM 23) AND JUST SOUTH OF PCB (45.52)

Final items continue taking place. Post Ranch rockery repair was completed last week. No work scheduled for this week. Project is near completion.

Caltrans reminds motorists to move over and slow down when driving through highway work zones.

The next update will be on Tuesday, June 19.

Road & Lane Closures, 6/10-6/16

TAMC CONE ZONE REPORT                                  

 ROAD AND LANE CLOSURES SCHEDULED FOR JUNE 10 – JUNE 16

MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, June 10 through Saturday, June 16Please keep in mind that construction work is weather-dependent.

Highway 1 Storm Repair Along the Big Sur Coast
Due to past slides, State Route 1 is now closed at the Ranger Station North Ragged Point Inn and at Mud Creek.

Highway 1 – Carmel: June 11 – June 14 
Caltrans will perform highway pavement maintenance on State Route 1 beginning Monday, June 11 – Thursday, June 14. Motorists can expect one-way reversing traffic control from 8 am until 4 pm in the following locations:

There will be electronic message boards alerting the public of these lane closures and traffic control.  The California Highway Patrol (CHP) will be present to ensure a safe environment for everyone.  Motorists can expect delays not to exceed 10 minutes.

Highway 1 Climbing Lane Project: June 11-June 15
There will be reduced truck crossings on Rio Road as construction work continues next week, 7:30 a.m. to 3:30 p.m. Monday through Friday.

Drivers wishing to avoid the intersection may detour to Carmel Valley Road and Carmel Rancho Boulevard. All business and shopping centers remain open during construction.

Monterey County Resource Management Agency, in partnership with the Monterey County Office of Emergency Services, has announced the creation of a text message alert service for the Highway 1 Climbing Lane Project.

Sign up to receive text message alerts by texting Climbinglane to 888777.

Highway 68 – Monterey: June 11– June 15
One-way traffic control will be in effect for night time vegetation control work along eastbound Highway 68 between Ragsdale Drive and York School Road from 9 p.m. to 5 a.m., Monday – Thursday.

Highway 68 – Salinas River: June 11 – June 15
There will be alternating lane closures on eastbound and westbound Highway 68 between Spreckles Blvd and Reservation Road for bridge work. The work will occur from 9 a.m. to 3 p.m., Monday through Friday.

There will be alternating lane closures on eastbound and westbound Highway 68 between Spreckles Blvd and Reservation Road for nighttime bridge work. The work will occur from 7 p.m. to 6:30 a.m., Monday through Thursday.

The onramp for westbound Highway 68 at Spreckles Blvd will be closed for ongoing bridge work between 7 p.m. and 6:30 a.m., Monday through Thursday.

Highway 101 – Salinas: June 12
Daytime repair work along southbound Highway 101 at San Miguel Canyon Road from 9 a.m. to 1 p.m., on Tuesday.

Highway 101 – Salinas to the San Benito County Line: June 10 – June 14
Night time striping along northbound Highway 101 between Potter Road and San Juan Road from 8 p.m. to 5 a.m., Sunday through Thursday.

Highway 183 – Salinas: June 11
Daytime utility work along northbound Highway 183 from Lake Street to Salinas from 9 a.m. to 3 p.m., on Monday.

###

 

Highway One paving projects next week

Today’s Date: Wednesday, June 6, 2018

District:  05 – Santa Barbara, San Luis Obispo, Monterey, San Benito and Santa        Cruz Counties

Contact:          Susana Z Cruz (bilingual) or Colin Jones

Phone:            (805) 549-3138 or 549-3189

FOR IMMEDIATE RELEASE

CALTRANS TO PERFORM MAINTENANCE ON STATE ROUTE 1 SOUTH OF CARMEL HIGHLANDS NEXT WEEK

MONTEREY COUNTY – Caltrans will perform highway pavement maintenance on State Route 1 for four days next week beginning Monday, June 11. Motorists can expect one-way reversing traffic control from 8 am until 4 pm in the following locations:

There will be electronic message boards alerting the public of these lane closures and traffic control.  The California Highway Patrol (CHP) will be present to ensure a safe environment for everyone.  Motorists can expect delays not to exceed 10 minutes.

This work will be performed by the Caltrans Monterey Maintenance team resulting in a smooth ride for all travelers.

    Caltrans reminds motorists to move over and slow down when driving through highway work zones.

Highway Closure Update, 6/4/18

Basically, nothing has changed. Mud Creek opening still anticipated for mid September, Paul’s Slide continues with one light, traffic signal controlled traffic. Here are this week’s photos:

Two photos of Mud Creek (PM 8.9) from Thursday, May 31 and one aerial of Paul’s Slide from yesterday, June 3—courtesy of John Madonna

ED12B542-4DFC-4D78-9FEE-DA42DE34BF8EADFE97E7-CB89-4025-A58A-3ADEC5732EDD59FAF181-19C6-4C03-85B5-A1373E1F60F4

Prescribed Burn – Hearst San Simeon SP

SAN SIMEON, Calif. – Cal Fire has issued a prescribed fire operation in Hearst San Simeon State Park from Wednesday through Sunday.

The prescribed burn will be near the intersection of Highway 1 and San Simeon Creek Road and along the road connecting the Washburn Campground to the San Simeon Creek Campground and has been scheduled from May 30 to June 3.

NB Highway One backed up 20 miles

incident:  00352   Type:    Road/Weather Conditions   Location:   Sr1 / Rio Rd  Loc Desc:  NB 1 AT RIO RD    Lat/Lon:  36.539340 -121.910241   
Detail Information
6:43 PM 3 [5] 27-14 IS SR1/ROCKY CREEK BRIDGE
6:40 PM 2 [2] DUE TO TRAFFIC LIGHT
6:40 PM 1 [1] TRAFFIC BACKED UP 20 MILES