Highways 1 and 17 in Santa Cruz to have overnight roadwork, with significant delays and detours

Today’s Date: Friday, June 19, 2015District: 05 – Santa Barbara, San Luis Obispo, Monterey, San Benito and Santa       

                        Cruz Counties                                                  

Contact: Susana Z Cruz (bilingual) or Colin Jones

Phone: (805) 549-3138 or 549-3189

         FOUR NIGHTS OF PAVING ALONG HIGHWAYS 1 AND 17 IN SANTA CRUZ–BEGINNING SUNDAY

SANTA CRUZ – Four nights of paving along Highways 1 and 17 in Santa Cruz will take place from overnight Sunday, June 21 through Thursday, June 25 in the morning in the following locations:

1. Northbound Hwy. 1 at the Fishhook on:

· Sunday night, June 21 from 8 pm to 6 am

· Both lanes closed; detour available

· Up to 30-minute delays are anticipated.

 

2. Northbound Hwy. 1 at the Fishhook on:

· Monday night, June 22 from 8 pm to 6 am

· Both lanes closed; detour available

· Up to 30-minute delays are anticipated.

 

3. Southbound Hwy. 1 to Ocean St on:

· Tuesday, June 23 from 7 pm to 5 am

· Off-ramp closed; detour available

· 10-15 minute delays are anticipated.

 

4. Northbound Hwy. 1, from Fishhook to Pasatiempo on:

· Wednesday, June 24 from 8 m to 6 am (Thursday)

· #2 (middle) and #3 (right) lanes closed; #1 (left) lane open

· Up to 30-minute delays are anticipated.

 NOTE: There will be Electronic Message Boards alerting motorists of the closures and the CHP will assist with traffic control.

 All roadwork is expected to be completed Thursday morning, June 25.

 This roadwork is being performed by Caltrans Santa Cruz Maintenance crews as a safety precaution to repair the deteriorated highway to provide motorists and cyclists a safer route to travel.

 Caltrans reminds motorists to move over and slow down when driving through highway construction zones.

 For more information on this project and for traffic updates on other Caltrans projects in Santa Cruz County, residents can call the District 5 toll free number at 1-831-423-0396 or can visit our website at: http://www.dot.ca.gov/dist05/paffairs/release.htm#scr

Highway 9 closure on Feb 9

NOTE: FOR THOSE WHO PREFER NOT TO READ LONG BLOG POSTS: A ONE MILE SECTION OF HIGHWAY NINE WILL BE COMPLETELY CLOSED FOR 6 MONTHS – read the details.

Today’s Date: Tuesday, January 13, 2015
District: 05 – Santa Barbara, San Luis Obispo, Monterey, San Benito and Santa
Cruz Counties
Contact: Susana Z Cruz (bilingual) or Colin Jones
Phone: (805) 549-3138 or 549-3189
FOR IMMEDIATE RELEASE

HIGHWAY 9 FULL CLOSURE AT HENRY COWELL STATE PARK BETWEEN FELTON AND PARADISE PARK COMMUNITY NORTH OF SANTA CRUZ FOR CONSTRUCTION BEGINS MONDAY, FEBRUARY 9

SANTA CRUZ COUNTY– Crews will be constructing a retaining wall and viaduct, as well as modifying drainage systems at four locations along Hwy. 9, one location will require an extended full closure of a one-mile section of the highway (Mile Marker 3.55 to 4.4) at Henry Cowell State Park from Felton to the Paradise Park Community north of Santa Cruz starting Monday, Feb. 9 at 9 am, Caltrans officials have announced. Roadwork will be as follows:

Location 1: (Northern Henry Cowell Boundary—from Felton to the Paradise Park Community)
Full, 24-hour closure for five to six months;
10-15 minute delays anticipated for additional travel time due to detour.
No driveways/intersections will be closed at Location 1. There will be access for all residences and businesses.

Locations 2-4: (No full closure, one-way traffic control)
Location 2: between Alba Rd. and Western Ave.
Location 3: near San Lorenzo Ave.
Location 4: north of McGaffigan Mill

Traffic at these locations will consist of reversing one-way traffic control for a duration of one month each Mon-Thurs: 9 am to 4 pm and 10 pm to 6 am; Fri: 12 am (midnight) to 6 am and 9 am to 3 pm 10-15 minute delays anticipated for weekday reverse lane closure. (MAP LINK TO ENTIRE PROJECT BELOW)

There will be electronic message signs alerting motorists of this closure. Motorists can use Hwy. 17 to Mt. Hermon Rd. or Graham Hill Road (bicyclists) as the detour/alternate route. The entire project is expected to be complete by the end of July, weather permitting.

The contractor for this $2 million project is Graniterock Company of San Jose, CA.
Caltrans reminds motorists to move over and slow down when driving through
highway work zones.

https://maps.google.com/maps?saddr=Boulder+Creek,+CA&daddr=Vernon+St,+Santa+Cruz,+CA+95060&hl=en&ll=37.058191,-122.077332&spn=0.226307,0.527&sll=37.045039,-122.034588&sspn=0.113173,0.2635&geocode=Fap_NgIdNZC4-Cn9WNvMEU-OgDEFCwQpg0kxBA%3BFYVuNAIdoPC5-CnrFBvVS0COgDF3bpLJ3yEIBg&oq=boulder+creek&mra=ls&t=m&z=12

Susana Z. Cruz
Public Information Officer/
Portavoz de Relaciones Públicas
805. 549.3138
805.549.3326–fax
Follow us on Facebook