They’ve filled to grade already and are putting in a 60in. over flow culvert today covered with concrete. Apparently another contractor will come later to bore through the compacted fill for the 10 ft pipe on the bottom. (Photos by Dave Nelson)




They’ve filled to grade already and are putting in a 60in. over flow culvert today covered with concrete. Apparently another contractor will come later to bore through the compacted fill for the 10 ft pipe on the bottom. (Photos by Dave Nelson)