Hard Closure at Bridge

And now you are stuck one side or the other, and it is closed between you and Nacimiento at both Cow Cliffs and Paul’s Slide
At 6:20 PM Cal Trans says:

Effective immeditely, there is a now a hard closure at Pfeiffer Canyon Bridge at PM 45.5. Nobody is allowed to cross the bridge except for emergency services. CHP is enforcing the closure until noon Sunday, February 12. Crews will be onsite at 9:00 AM to examine the bridge.

Another update will be provided around noontime tomorrow, Sunday, Feb. 12, or sooner if conditions change.

So letting tourists in who had reservations was a great idea, wasn’t it?

Closure on Highway moves north to Pfeiffer Cyn Bridge, MM 45.52

Here is the announcement from Cal Trans with Photos


These three photos are of Pfeiffer Cyn Bridge Cyn Bridge (PM 45.5) from today.

***NEW INFORMATION, IMPORTANT INFO FOR LOCALS **

State Route 1 is now closed between Ragged Pt. (SLO 72.87) and Pfeiffer Cyn Bridge(PM 45.5)

Due to slope movement and slippage, the Bridge column has moved–causing multiple fractures to One of the Two columns on the bridge.

Motorists may travel north on State Route 1 from Cambria to Ragged Point (SLO PM 72.87) or south from Carmel to Pfeiffer Cyn. Bridge (PM 45.5)

The roadway is not passable between Ragged Pt (SLO 72.87)and Dolan Pt (PM 29.70)

*LOCALS MAY TRAVEL BETWEEN DOLAN and SOUTH of PFEIFFER CYN BRIDGE (PM 45.5) AND AVOID CROSSING BRIDGE.

*BUSINESSES REMAIN OPEN*

Thank you for your patience and understanding. Our Maintenance, Geotech and Construction crews continue to work collaboratively and diligently, as much as safely possible in response to these rock/mudslides.

Another update will be provided around noontime
tomorrow, Sunday, Feb. 12, or sooner if conditions change.

Susana Z. Cruz [nature-flower-blue-motif[1]]
Caltrans District 5
Acting Manager
Public Information Office

Per CHP:
3:55 PM 6 [12] 27-D6 CT HAS LOOKED AT BRIDGE / ENGINEERS ADV IT’S COMPROMISED / EVERYONE HAS TO EVACUATE TO THE JNO IT / **THAT’S WHERE NEW CLOSURE IS AT [Shared]
3:54 PM 5 [11] 27-D6 MOVING CLOSURE TO BRIDGE DOING EMERGENCY EVACS OF SR1 DUE TO STRUCTURAL INTEGRITY HAS BEEN COMPROMISED [Shared]
3:25 PM 4 [10] [Notification] [CHP]-ONLY RESIDENTS WILL BE ALLOWED IN , NO LRG VEHS ALLOWED THROUGH (FOOD TRKS, ETC) [Shared]
3:24 PM 3 [8] [Notification] [CHP]-PER HEATH JOHNSTON W/ C/T, MOVING CLOSURE TO MM 45.52 (PFEIFFER CYN BRIDGE) DUE TO ISSUE W/ A BRIDGE COLUMN THEY LOCATED TODAY [Shared]

Paul’s Slide – possible one lane opening?

Brendon just walked through this and sent these photos. You will see it looks as if Cal Trans is hopeful it can reclaim one lane as they are putting in the necessary elements to establish a signal light – generator and propane. Also additional photos of the cribbing coming apart. NIce photos, Brendon Shave. (One photo refused to load for some reason – may have been too large.)

img_2059img_2060img_2062

Road Closure, 2/11/17

img_2052img_2053img_2054img_2057img_2058img_2055img_2056

First two photos are of today’s just north of Salmon Creek (PM 3), the next three are of/around Paul’s Slide (PM 21.6), last pic is of Cow Cliffs (PM 28.35(.Photos provided by Caltrans, two by Ken Harlan and one of Cow Cliffs by Brendon Shave, accordingly.

***NEW INFORMATION***
State Route 1 is now closed between Ragged Pt. (SLO 72.87) and Dolan’s Pt. (PM 29.70)–at 3pm
A new slide just north Salmon Creek (PM 3) ocurred today, requiring to keep the southern closure at Ragged Pt. The slide south of Deetjen’s was stabilized so the Northern closure will move to Dolan Pt (PM 29.70) at 3pm.

Motorists may travel north on State Route 1 from Cambria to Ragged Point (SLO PM 72.87) or south from Carmel to Dolan Pt (PM 29.70) as of 3pm TODAY.

The roadway is not passable between Ragged Pt (SLO 72.87)and Dolan Pt (PM 29.70)

*LOCALS MAY NOT TRAVEL NORTH BETWEEN Ragged Pt and Cow Cliffs (PM 28.35).

*BUSINESSES REMAIN OPEN*

Thank you for your patience and understanding. Our Maintenance, Geotech and Construction crews continue to work collaboratively and diligently, as much as safely possible in response to these rock/mudslides.

Another update will be provided on around mid-morning Monday, Feb. 13, or sooner if conditions change.