



From Sander Koning, photo by Blain Vandenberg

Sunday, a day off, and a trip back to Africa, because, once again, I am sick of roads and slides and bridges and closures so I am escaping.






Escape into Mother Nature today, whether in your local forest, city park, or your own backyard. Celebrate her everyday, but particularly today.
For Memorial Day.

I have lots of photos of Paul’s Slide and of Mud Creek that have been sent to me this weekend, so I’ll get to that and get them up this morning.
I am tired of fires & floods & road closures. I wanted to go somewhere else this Sunday. I bring you the Lions of Africa, taken 3 years ago.







Unless there is yet another serious emergency, I am taking the day off. Barbara, thank you for these. They are gorgeous, and much better than a live bouquet! I can enjoy them for YEARS!







I truly love spring!

Bluebonnet Lupine (Lupinus palmeri) with Owl’s Clover (Castilleja exserta) in the left corner. California poppies thrown in for contrast.

Same

Field of bluebonnets

Western Columbine (Aquilegia Formosa)



From Cal Trans:





Photos from this weekend of: 1) Temporary Mesh Netting installed at Big Creek/Cow Cliffs (Sat-PM 28.5); 2) Rock fall at Lucia (Sun-PM 23); Rock fall at Paul’s (Sun-PM 26.10); and Partington Ridge (this am—PM 38.6)
***NEW INFORMATION***
The weekend’s inclement weather gave us various small slides at multiple locations, but thankfully and diligently, we have been able get the roadway clear and provide good news for tomorrow morning, weather permitting.
EFFECTIVE TOMORROW MORNING, TUESDAY, FEB. 7 AT 7 AM (WEATHER PERMITTING):
*DUE TO MORE SLIDE MATERIAL AT PAUL’S SLIDE (PM 21.6), All Motorists may travel north on Hwy. 1 from Cambria to Limekiln Creek Bridge (PM 21.3) or south on Hwy. 1 from Carmel to Lucia (PM 23).
*If you have been following our updates, you know we have dealt with various challenges, below is the status:
1) Mud Creek (PM 8.8)—continues with drilling taking place and daytime one-way traffic control (flagging). However, slide material continues to come down. Expect 20-30 minute delays.
2) The culvert has been replaced/repaired at PM 14.4 and is no longer covered with steel plates just north of Sand Dollar Beach (PM 13.85).
3) At Paul’s Slide (PM 21.6), although we have a temporary stop sign and eventually a traffic signal—MORE MATERIAL IS COMING DOWN AND THERE IS STILL A FULL CLOSURE AT PAUL’S. (see photo).
4) There was a small slide at Lucia (PM 23) this weekend, but has been cleared. (see photo)
5) Temporary mesh netting took place this Saturday at Big Creek/Cow Cliffs (PM 28.35), allowing the roadway to open at this location. (see photo)
6) There was a slide this morning at Partington Ridge (PM 38.6), necessitating the roadway to close at Fuller’s but has been cleared and will be open to traffic. (see photo).
The roadway is not passable between PAUL’S SLIDE (PM 21.6) and LUCIA (PM 23).
Thank you for your patience and understanding. Our Maintenance, Geotech and Construction crews continue to work collaboratively and diligently, as much as safely possible in response to these rock/mudslides.
Another update will be provided on around tomorrow, Tuesday, Feb. 7 afternoon, or sooner if conditions change.
Susana Z. Cruz nature-flower-blue-motif[1]
Caltrans District 5
Acting Manager
Public Information Office