October CA Wildfires

This is a very clear map and discussion of all the various wildfires here in CA right now, by the OES. To continue reading the rest of it (too much for a screen shot) see the address in the address bar of the screenshot. (BTW, the Pozo fire in SLO is either controlled or contained.)

9A043546-2AB5-4F20-B236-E7631E18BC34

Post Helicopters to end Friday

I have been asked to share, and I know a few of you will be so glad to hear that the helicopters WILL end once the bridge opens.

Big Sur Friends & Residents,

On behalf of all of us at Post Ranch Inn, we thank you for your support, patience, and understanding over these past months with respect to transporting our hotel guests in and out of Post Ranch by helicopter.

As we shared from the beginning, Post Ranch had no plans, nor any desire, to continue flying guests by helicopter once Highway One re-opened. With that in mind, we will stop flying our guests in and out of Post Ranch by 3 pm on Friday, October 13th pending the re-opening of the Pfeiffer Canyon Bridge. We have strongly encouraged our guests checking in on Friday to delay their arrival and drive to Post Ranch after the bridge re-opens.

Thank you again for your understanding and enduring the many challenges we all faced as a community these past 10 months.

With gratitude,

Kevin Geanides and the Post Ranch Inn team

 

Inline image 1
Kevin Geanides
General Manager
POST RANCH INN
47900 Highway One | Big Sur, CA 93920
phone 831-667-2200 | mobile 831-293-4393
http://www.postranchinn.com

Highway Closure Update

DAFC330B-26F0-41EE-985E-D21139517C9F

FEC2A7C5-13EA-4B11-9A92-6723909313B8

Photos of: 1) Mud Creek (PM 8.9) and Pfeiffer Canyon Bridge (PM 45.52) on Oct. 4-PCB image courtesy of Kyle Evans.

HIGHWAY 1 UPDATE – Tuesday, Oct. 9

The new Pfeiffer Canyon Bridge (PM 45.52) will open by 5 pm on Friday, Oct. 13 assuming there will be no issues involving weather/material/equipment. After the bridge opening, Highway 1 in Monterey County will provide 35 additional miles of Hwy. 1 for travelers to Gorda (PM 10). State Route 1 remains closed from north of Salmon Creek, just south of the Ranger Station (PM 3) to just south of Gorda (PM 10) due to the Mud Creek slide. State Route 1 south of Salmon Creek is accessible via State Route 1 in San Luis Obispo County near Ragged Point.

REMINDER: Travelers still CANNOT access the entire length of Highway 1 from Carmel to Cambria but local businesses are open on both sides of Mud Creek.

Pfeiffer Canyon Bridge [PCB] (PM 45.52)
Final work to continue for several weeks but Pfeiffer Canyon Bridge will provide access to both locals and the public by 5 pm on Friday, Oct. 13, assuming there will be no issues involving weather/material/equipment. There will be some weekdays that will require a lane closure consisting of one-way reversing traffic control but once the bridge opens, it won’t need to fully close. See attached program regarding ribbon-cutting event details.

Mud Creek (PM 8.9)
Mud Creek had a major slide on Saturday, May 20, 2017, losing over 5 million cubic yards of material. Caltrans continues with its plan to realign the existing terrain. The projected timeline to safely open to public traffic is late-summer 2018 at an estimated cost of $40 million.

There is currently no public access through the Mud Creek area since this remains an active, emergency construction zone.

Paul’s Slide (PM 21.6)
Paul’s Slide is still active but the 24/7 traffic signal remains in place and temporary guardrail (k-rail) in the centerline.

Caltrans reminds motorists to move over and slow down when driving through highway work zones.
Susana Z. Cruz nature-flower-blue-motif[1]
Caltrans District 5
Public Information Officer

Photo Sunday, 8/8/17 (History)

D369F46B-5AC9-40F3-86C0-65E5F6310D72

Today (photo by bigsurkate)

B1A1928E-96A1-4D63-A308-76C91BC87BB6

Circa early 1900’s (photo from the MCHS)

6AE9017B-0D30-4044-9983-FE2D24E9911D

Local historian Valance Heinsen has chronicled the growth of Jolon, noting that it had its beginnings as a home remodeled to an inn as early as 1850, then further remodeled to the two-story Dutton Hotel in 1876. A Chinese population attracted to mining ventures in the area operated a laundry in Jolon in the 1850s. The village experienced a growth spurt with Dutton’s remodeling of the inn, and a dance hall and community church were added between 1876 and 1879. A community hall, school, granary, and several new houses were constructed by 1888. Several large horse barns and a smithy were added in the early 1890s, along with a detached post office and a telephone office. Several farmers moved into town in the 1890s, further expanding the population and offsetting losses brought about by the closing of the Los Burros mines.

The coastal regions of southern Monterey County were isolated from settled regions to the north (Big Sur) and south (Cambria) because of the precipitous terrain, and were more closely tied to commercial and social affairs of the San Antonio Valley-Jolon-Lockwood area than to other coastal communities. A mail road, actually a horse trail, led from Jolon through present day Fort Hunter Liggett lands to the Santa Lucia divide, where several trails led down to the coast or to the mining camps in the mountains. Settlers from the Lucia area and south to Pacific Valley followed trails over the mountains that rendezvoused at Wagon Cave (CA-MNT-307) on the San Antonio River, where horseback travelers switched to wagons stored there for the purpose of hauling provisions from King City and Jolon.

One less heartbeat in my house

Bear was not a loud dog, except outside when guarding us. He was a sweet dog. His tail was always wagging. He didn’t scratch to be let in or out, he waited for others to do that, and then tagged along. He was sometimes stubborn about coming in for dinner if he wasn’t finished with his duties.

As my FB and twitter followers know, Bear passed yesterday just before 3 pm. I called him Bear, or Bear Dog. This photo was taken in December of 2016 – the day Gideon died. Bear will always be in my heart, right alongside his papa, Gideon, and his sister, Miranda. It seems so quiet today, even though he was not a loud dog. I think it is the one less heartbeat in my house that makes it so quiet. Run and play free, my beautiful, loving boy.

D820C30A-D5A1-45D6-A18E-747F47C66BCF

Controlled burn on Ft Ord

Photo by Mike Morales from his house in East Garrison this am, shorting after 9 am when the prescribed burn started:

7906A629-859E-45D3-BE92-563CD6B69C0D

 

Photos by Nestor Marin from Gen Jim Moore Rd:

231BF8E2-B637-4952-8A88-526E695E2FAB78125DC4-2485-4588-B570-2B5818290699

Just a reminder, I’ve already received queries. This morning. Photo by Sandy O’Keefe Bellamy.

2B0C2488-D98F-4525-92E7-547E6595742B2FCF638B-0540-4BFE-9849-F740CDB31317

Sycamore Canyon Rd. & Pfeiffer Beach

From CPOA:

In anticipation of reopening the Pfeiffer Beach Day Use Area, the USFS will be doing some repairs and cleanup on Sycamore Canyon Road some distance up from the beach toward Highway 1. This may cause some delay and problem for anyone needing to access Clear Ridge and Front Hill Roads and that general area.

Hours of work will be from 7:00 AM to 5:30 PM and that part of the road will be closed. The USFS recommends accessing Clear Ridge via the Brewers Bridge gate.

This work started on October 3rd and may continue through October 13th, the opening day of Pfeiffer Canyon Bridge. If more specific details are provided to us by the USFS, we will forward them to you.

Also from CPOA:

There have been recent discussions by CPOA and local residents with the US Forest Service about the over use of Pfeiffer Beach and Sycamore Canyon Road that provides access to the beach. These recent discussions are, in fact, a continuation of discussions that have spanned over 20 years with no significant improvement in the management of this worldwide destination. With visitation exceeding all records year after year, there is an ever increasing health and safety issue that needs to be addressed by the USFS.

You may download a letter from CPOA and an attachment from the Big Sur Volunteer Fire Brigade, by clicking HERE, that has been sent to the new Acting Forest Supervisor requesting immediate attention to this growing problem. (PDF file, 3 pages, 157KB).

Please read these letters by Butch and Martha. This is a serious issue with little time to resolve before opening of the bridge and the beach.

Vehicles Must be moved by 10/11 at midnight

From the Big Sur Chamber of Commerce:

All vehicles parked on the east and west sides of the Highway 1 right of way, between the south side of Pfeiffer Canyon Bridge and the turn-around across from the US Post Office must be moved no later than midnight, Wednesday, October 11, 2017. This is necessary to facilitate the opening of Pfeiffer Canyon Bridge to public access on Friday, October 13, 2017. Any vehicle parked in this area after midnight on Wednesday, October 11, 2017, will be subject to ticketing and towing, if necessary. Please pass the word to your neighbors.

Thank you,

Kirk

Kirk Gafill
President Big Sur Chamber of Commerce